Chapter GMW | E30 LS1 (starting on post #1427)
-
I'll get the head torque process started today or Thursday. I'm driving it in 2 weeks
Sent from my SM-G900V using Tapatalk
-
I'll get the head torque process started today or Thursday. I'm driving it in 2 weeks Sent from my SM-G900V using Tapatalk
Those seem to be my famous last words
-
A little progress was made. I'll update with pics tomorrow.
- Head is torqued down to 35 ft/lbs. I'll recheck and go to 65 ft/lbs if they hold at 35 for the night.
- Intake manifold is tapped and drilled for multi-port meth injection.
- Mounted the distribution block and ran the 6 lines to the jet fittings.
- Broke one jet from over tightening it. Sometimes I'd like not to learn anything new...
- Picked up my diff cover and output shafts from Snap. I'm planning on getting the new diff in tomorrow morning.
Sent from my SM-G900V using Tapatalk
-
Sometimes I'd like not to learn anything new...
Quote of the decade right here
-
New winter car!
2002 325xi automatic. Work and wife friendly. Got a compression test and it is A-OK!!


One out of three working ain't bad.

Head ready to rock and roll!

Done with the block prep. Used a stone, then went to 600 grit sandpaper with WD-40 for the lube. The finish was glass so I called it quits after the 600.


Fresh ARPs

Hondabond on the timing cover.

Cut Rings!


Perfect fit.


New one-way valve.

ARP lube but not too much. Used a rubber mallet to knock in the steel dowels. Also took brake cleaner, Q-tips and pressurized air to clean out the block threads. Used these three steps about three times. Some holes were dirtier than others. :nice:

Initial torque to 35 ft/lbs after triple checking the cut rings were sitting properly.


-
Tapped the M50 manifold with a 1/8 NPT tap for the multi-port meth install.

The .4mm jets for the intake runners. Also have a single .7mm jet for a pre-throttle body nozzle.

Distribution Block.




Snapped a jet from over tightening...:doh:

6 gallon Meth tank.

Wangmanstyle Diff Install!









Torqued the head to 65 ft/lbs after I re-torqued the bolts to 35 ft/lbs this morning. About 5 "jumped" to an easier spot (about 30 ft/lbs) at this stage then tightened to 65 ft/lbs if that makes any sense.

-
Great shots, new daily looks clean too!
Thanks!
It is pretty clean. Only 2 very small rust spots (license plate light area & rear quarter by bumper) Needs a good amount of trim pieces, new drivers front axel, has an oil pan leak, underbody is super clean. It was owned by a BMW tech at concours' wife. A lot of maintenance has been done.
Sent from my SM-G900V using Tapatalk
-
Started to wire up my oil temp gauge. Also replaced my oil pressure gauge with a new one.


Used fish tape.

Hardwired my V1 detector.



Rigged up a broken vent.


Retorqued the head studs to 65 this morning. A couple were loose. Retorqued them again around Noon. I'll check tomorrow to see if any move. If they don't I'll go up to 85 ft/lbs.
Cut into the VSS coming out of the speedometer for the rear wheel speed input to the Traction control chip. Still have to cut the front left ABS wires and run them into the cabin.
Pulled the wires through the firewall for the oil pressure and oil temp. Still need to install the sending units.
#b33rm3
-
yummmmm... Meth... Looks like things are coming along! Nice daily! Keep an eye on the DISA valve if it hasn't been replaced already. That can be catastrophic!
-
yummmmm... Meth... Looks like things are coming along! Nice daily! Keep an eye on the DISA valve if it hasn't been replaced already. That can be catastrophic!
Thanks! I'll have to look into that.
-
Oil temp setup. Had to drill out the 1/4 to 1/8NPT fitting so the VDO sensor could get all up in. This will be picking up the temp from the cold side of the oil cooler.

I don't think I could have fit a bigger cooler in there. The grinder was used a fair amount and the mounts are temporary...haha




Setrab used:

-
No pics from today/tonight but I'll do an update for the r3cord.
- Torque 'd down the head again at 85 ft/lbs. About 6 had some movement until they got to 85ft / lbs. Did this at Noon.
- Addressed the diff speed sensor. She is good to go.
- Cut into the right front ABS signal wire, extended it and pulled it through the firewall for the traction control chip.
- Wired up the sending units for the oil temp and pressure. The gauges are wired up and illuminated. Hopefully...
- Looked at my wiring harness for a bit.
That is all for now.
Sent from my SM-G900V using Tapatalk
-
Took the spring in the wastegate from 18psi to a 9psi combo.

Old setup.

Turned the attention to the BOV. Pic for reference.

Torque update: Retorqued this morning to 85ft/lbs. Some are good, some have a bit of creep. We'll see what we get tomorrow AM. Once the head bolts are all snug the new OEM timing cover housing bolts will go in with blue loc-tite to 89in/lbs if I remember correctly. Then the cams.
Ordered an EBC and acquired all the hardware to hook her up. Going fuel lines instead of braided this go round for vacuum.
Also rounded up fuel lines and fittings for my billet fuel rail. that has been collecting dust.
-
-
Making the earth ground for the megasquirt.

Ready for the strut tower!

Getting ready for wiring up the traction control. The brown ABS wire is the ground for the sensor??

Don't mind the bent valance.

Torque Update: There are 4 studs that have a slight creep in them. I'll re-torque tonight. Getting close!
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login