YoungCR said:
Might need some brake caliper brackets made up depending on the eventual e30 brake setup. Also I need a floor drain cover machined right now to block off my shop drain.
That can be done! I'm starting off with just a CNC lathe, but plan on expanding to millwork shortly after. It mostly depends on what I can get for a machine loan.
I can spin you one up no problem Chris. The only problem is, earliest production is set to take place in June-July. So if you still need it then, we can talk.
Snap said:
Chad, will you be my aluminum and stainless go-to welderguy?.
As of now I am SS (303-312) capable/ready, but unfortunately I can't do aluminum. My machine is a dc only setup, I didn't have the funds for a miller synchrowave to do AC (aluminum) work.
That said, I have successfully welded exhaust pipe to a cast iron manifold, for an external wastegate. I did it for my DUALLY. So even though aluminum isn't an option, I am able to do other exotic combinations