E21 Project Thread - Part 2
-
HOLY SHIT DAVE!
You've been busy in the time that I've been pretending that I don't own a project car.
I think you and I need to have a sit down talk about parts and what not.
Looks awesome man I cant wait to see videos
Thanks man! Yeah for sure. I'd be down for a little sit down talk about stuff. I am in limbo mode right now due to my megasquirt connection issues. Otherwise I am sure I would have been driving around by now.
-
That's the next step. I will try using my tablet with Bluetooth connector (tomorrow hopefully) and see what happens.
-
One floor structural adhesive and riveted down. One more to go (for now)

-
Driver side floor is done

New accelerator pedal installed

Found a source in Portugal for group 2 parts and picked up the missing link to my kit, the front airdam

Figured out the stupid connection issue and got the car running and idling on its own too.
-
Did some more idle tuning, but was cut short when I noticed oil dripping bad from under the car. Turns out the exhaust manifold melted a hole in the turbo oil feed line. Time to make a new line and route it differently.
-
Getting closer with my modified dash panel.

I'll post a pic of it when done.
-
your updates are riveting.

-
your updates are riveting.

I live on the edge.
-

It idles extremely well, just needs some road/load tuning (video posted probably wont show for tapatalk users)
-
^^^ so much win!!!
Brian (snap) came over tonight and helped do some idle tuning on the ole Megasquirt. Running way better than it was before. I have a small coolant leak and exhaust leak to tend to, but other than that sounds super smooth and healthy.
-
Finished up the center dash piece. Just have to wire it up in car now.


-
Does the push button start activate the efan when pushed at 13k clicks per minute when the car is stalled mid traffic?
**paging (s)nap
-
Got the center dash push button ignition all wired up, installed and working. No pictures tho unfortunately.
I also picked up a spare e21 rear subframe and an e30 rear subframe from JP to do a little chop surgery. I will be getting a chop/cut/weld operation done to put the e30 diff carrier onto the e21 subframe so that I can upgrade to a stronger e30 lsd instead of the super weak e21 lsd. Like shown below in some reference pics I found over on bf.c



-
Starting surgery on the passenger side floor pan this past weekend. Started off by using an air scraper to get rid of all the sound deadening tar material so I could see the extent of the rust.

It looks bad in the pic, but in reality the rot is a smaller area than I previously thought. Most of the area that looks like "surface rust" in the pic is actually just residue from the tar material.
I then busted out the air saw and started cutting away the rot out to some good solid metal.

Still have some more to cut out. After that I will kill any remaining surface rust with the kbs system, cut my new floor pan to shape and start the rivet process just like the driver side.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login

